{"id":15278,"date":"2016-12-16T16:25:58","date_gmt":"2016-12-16T15:25:58","guid":{"rendered":"http:\/\/cometal.aranere.be\/?page_id=15278\/"},"modified":"2023-08-21T12:21:47","modified_gmt":"2023-08-21T10:21:47","slug":"formwork-system","status":"publish","type":"page","link":"https:\/\/www.cometal.be\/en\/formwork-system\/","title":{"rendered":"Formwork system"},"content":{"rendered":"
<\/span><\/li>
<\/span><\/li>
<\/span><\/li><\/ul><\/div>Cometal N.V.\u00a0 is specialized in highly efficient modular wall formwork<\/strong>. In the space of 40 years Cometal evolved from a pioneer to an established force in the field of formwork<\/strong> techniques.<\/p>\n Below you will find an overview of our main\u00a0formwork<\/strong> system product groups with a description of the usability of these products.<\/p>\n Should you wish to receive further information regarding the choice of formwork<\/strong>, please contact-us!<\/a><\/u><\/p>\n Aluminium frame with multiply timber board. Steel frame with a 5 mm thick steel plate for exposed, visable, architectural concrete. Steel supports which absorb the concrete pressure during blind pouring. Used for high walls poured in different stages. Blinding used in lift shaft and stairwells. Aluminium table formwork for floors and decking. Galvanized steel frame with multiply timber board. Made-to-radius multiply timber board. Made-to-radius multiply timber board. Aluminium frame with multiply board.
<\/a><\/p>\nAlcom formwork system<\/span><\/a><\/h2>\n
\nApplications: general concreting, pouring of walls, columns, beams, foundations, bases, basements, swimming pools, pits, lift shafts, stairwells…<\/p>\n
<\/a><\/p>\nBimet formwork system<\/span><\/a><\/h2>\n
\nApplications: exposed concrete, fair-face concrete, pouring of RDC-concrete, self-levelling concrete, self-sealing concrete, seamless concreting…<\/p>\n
<\/a><\/p>\nStabilizers<\/a><\/span><\/h2>\n
\nApplication: for concrete works in which only one side is shuttered, e.g., against an existing wall, sheet pile, secam poles…<\/p>\n
<\/a><\/p>\nClimbing formwork<\/span><\/a><\/h2>\n
\nApplication: pouring of high walls over different storeys, e.g. apartment buildings, flats, office buildings, lift shafts or stairwells…<\/p>\n
<\/a><\/p>\nLift slabs<\/span><\/a><\/h2>\n
\nApplication: movable blinding for the shuttering of lift shafts or stairwells or any other type of shafts.<\/p>\n
<\/a><\/p>\nAltor slab formwork<\/span><\/a><\/h2>\n
\nApplications: supports for the pouring of floors, bridge decks up to a thickness of max. 2 m, beams, terraces, decks, preslabs, wideslab flooring…<\/p>\n
<\/a><\/p>\nCicom large surface formwork<\/span><\/a><\/h2>\n
\nApplications: large-scale projects with long, repetitive walls in which the use of large-surface panels considerably increases the shuttering yield.<\/p>\n
<\/a><\/p>\nHorad formwork R < 3m<\/span><\/a><\/h2>\n
\nApplication: casting of curved walls with a radius of between 1,2m and 3m.<\/p>\n
<\/a><\/p>\nHorad formwork R > 3m<\/span><\/a><\/h2>\n
\nApplication: casting of curved walls with a radius exceeding 3m.<\/p>\n
<\/a><\/p>\nDelta formwork<\/span><\/a><\/h2>\n
\nApplications: casting of concrete exposed walls in which the ligature holes are spaced at 600 mm intervals to give a uniform effect.<\/p>\nCentre stage<\/span><\/h1><\/div>
<\/a><\/li><\/ul><\/div>Hoppe Residential Flats in Temse<\/a><\/h4>